{"id":5478,"date":"2014-08-16T11:55:08","date_gmt":"2014-08-16T06:25:08","guid":{"rendered":"http:\/\/patriotsforumindia.com\/?p=5478"},"modified":"2014-08-16T11:55:08","modified_gmt":"2014-08-16T06:25:08","slug":"appropriate-technologies-on-low-cost-toilets-gramalaya-tiruchirapalli-%e0%a4%b8%e0%a4%b8%e0%a5%8d%e0%a4%a4%e0%a5%80-%e0%a4%b8%e0%a5%81%e0%a4%b5%e0%a4%bf%e0%a4%a7%e0%a4%be%e0%a4%9c","status":"publish","type":"post","link":"https:\/\/patriotsforumindia.com\/?p=5478","title":{"rendered":"Appropriate technologies on low-cost toilets &#8211; Gramalaya \u2013 Tiruchirapalli : \u0938\u0938\u094d\u0924\u0940 \u0938\u0941\u0935\u093f\u0927\u093e\u091c\u0928\u0915 \u0936\u094c\u091a\u093e\u0932\u092f \u0915\u0940 \u0924\u0915\u0928\u0940\u0915 \u0935\u094d \u0921\u093f\u091c\u093e\u0908\u0928"},"content":{"rendered":"<p>\u092e\u094b\u0926\u0940 \u091c\u0940 \u0928\u0947 \u0932\u093e\u0932 \u0915\u093f\u0932\u0947 \u0938\u0947 \u091c\u094b \u0938\u092b\u093e\u0908 \u0905\u092d\u093f\u092f\u093e\u0928 \u091b\u0947\u095c\u093e \u0939\u0948 \u0909\u0938\u0915\u094b \u0906\u0917\u0947 \u0932\u0947 \u091c\u093e\u0928\u0947 \u0915\u0947 \u0932\u093f\u090f \u0907\u0938 \u0932\u0947\u0916 \u092e\u0948\u0902 \u0935\u0930\u094d\u0937\u094b\u0902 \u0915\u0947 \u092a\u094d\u0930\u092f\u093e\u0938 \u0938\u0947 \u0935\u093f\u0915\u094d\u0938\u093f\u0930\u094d\u091f \u0915\u093f\u092f\u0947 \u0915\u0941\u091b \u0921\u093f\u091c\u093e\u0908\u0928 \u0939\u0948\u0902 . \u092f\u0947 \u0938\u0938\u094d\u0924\u0947 , \u091f\u093f\u0915\u093e\u090a \u0935\u094d \u092a\u093e\u0928\u0940 \u0915\u0940 \u0915\u092e\u0940 \u0935\u093e\u0932\u0947 \u0907\u0932\u093e\u0915\u094b\u0902 \u0915\u0947 \u0932\u093f\u090f \u092d\u0940 \u0939\u0948\u0902 . \u0926\u0947\u0936 \u091c\u094b \u091a\u093f\u0902\u0924\u0928 \u0906\u0930\u092e\u094d\u092d \u0915\u0930\u0947\u0917\u093e \u0909\u0938\u092e\u0947\u0902 \u0907\u0938 \u0930\u093f\u0938\u0930\u094d\u091a \u0915\u093e \u092d\u0940 \u0909\u092a\u092f\u094b\u0917 \u0915\u093f\u092f\u093e \u091c\u093e \u0938\u0915\u0924\u093e \u0939\u0948. \u090f\u0915 \u0936\u094c\u091a\u093e\u0932\u092f \u0915\u0940 \u0915\u0940\u092e\u0924 \u092a\u093e\u0902\u091a \u0939\u095b\u093e\u0930 \u092a\u093e\u0902\u091a \u0938\u094c \u0930\u0942\u092a\u092f\u0947 \u0939\u0948 . \u0907\u0938\u0947 \u0924\u093f\u0930\u0941\u091a\u0940 \u0915\u0940 \u090f\u0915 \u0905\u092e\u0930\u0940\u0915\u0940 \u0938\u0939\u093e\u092f\u0924\u093e \u0938\u0947 \u092c\u0928\u0947 \u0938\u0938\u094d\u0925\u093e\u0928 \u0928\u0947 \u0935\u093f\u0915\u0938\u093f\u0924 \u0915\u093f\u092f\u093e \u0939\u0948 . \u0939\u0930 \u0917\u093e\u0901\u0935 \u0905\u092a\u0928\u0940 \u0938\u0941\u0935\u093f\u0927\u093e\u0928\u0941\u0938\u093e\u0930 \u0926\u0938 \u092e\u0948\u0902 \u0938\u0947 \u0915\u094b\u0908 \u0921\u093f\u091c\u093e\u0908\u0928 \u091a\u0941\u0928 \u0938\u0915\u0924\u093e \u0939\u0948 .<\/p>\n<p>\u0935\u0948\u0938\u0947 \u0924\u094b \u092a\u095d\u0947 \u0932\u093f\u0916\u094b\u0902 \u0915\u094b \u092f\u0939 \u0935\u093f\u0937\u092f \u092c\u0941\u0930\u093e \u0932\u0917 \u0938\u0915\u0924\u093e \u0939\u0948 \u092a\u0930\u0928\u094d\u0924\u0941 \u0909\u0928\u094d\u0939\u0947\u0902 \u092f\u093e\u0926 \u0930\u0916\u0928\u093e \u091a\u093e\u0939\u093f\u090f \u0915\u0940 \u0917\u093e\u0901\u0927\u0940 \u091c\u0940 \u0915\u0947 \u0915\u093e\u092b\u093f\u0932\u0947 \u092e\u0948\u0902 \u0906\u0916\u093f\u0930 \u092e\u0948\u0902 \u090f\u0915 \u0939\u0932\u094d\u0915\u093e \u0936\u094c\u091a\u093e\u0932\u092f \u092d\u0940 \u0939\u094b\u0924\u093e \u0925\u093e . \u0909\u0938 \u0915\u094b \u0917\u093e\u0902\u0927\u0940\u091c\u0940 \u0938\u093f\u0930\u094d\u092b \u0926\u0947\u0936 \u0915\u0947 \u0938\u094d\u0935\u0938\u094d\u0925 \u0938\u0947 \u0915\u094b\u0921 \u0915\u0930 \u0926\u0947\u0916\u0924\u0947 \u0925\u0947 . \u0907\u0938 \u0926\u0938 \u0939\u095b\u093e\u0930 \u0938\u093e\u0932 \u092a\u0941\u0930\u093e\u0923\u0940 \u0938\u092d\u094d\u092f\u0924\u093e \u092e\u0948\u0902 \u0936\u094c\u091a\u093e\u0932\u092f \u092a\u0930 \u0930\u093f\u0938\u0930\u094d\u091a \u0915\u0940 \u0906\u0935\u0936\u094d\u092f\u0915\u0924\u093e \u0928\u0939\u0940\u0902 \u092a\u094d\u0930\u0924\u0940\u0924 \u0939\u094b\u0917\u0940 \u092a\u0930 \u091c\u092c \u0907\u0938 \u0932\u0947\u0916 \u0915\u0947 \u0921\u093f\u091c\u093e\u0908\u0928 \u0926\u0947\u0916\u0947\u0902\u0917\u0947 \u0924\u0930\u094b \u0938\u092e\u091d \u0906\u092f\u0947\u0917\u093e \u0915\u0940 \u0926\u0947\u0936\u00a0 \u0938\u093e\u0927\u0930\u0923\u00a0 \u0909\u092a\u092f\u094b\u0917 \u0915\u0940 \u091a\u0940\u091c\u094b\u0902 \u092e\u0948\u0902 \u092d\u0940 \u0915\u093f\u0924\u0928\u093e \u0906\u0917\u0947 \u092c\u095d \u0938\u0915\u0924\u093e \u0939\u0948 .<\/p>\n<p>\u092a\u0942\u0930\u093e \u0932\u0947\u0916 \u091a\u093f\u0924\u094d\u0930 \u091a\u093f\u0924\u094d\u0930 \u0935\u094d \u0915\u0940\u092e\u0924\u0947\u0902 \u0926\u0947\u0916\u0928\u0947 \u0915\u0947 \u0932\u093f\u090f \u0932\u093f\u0902\u0915 \u092a\u0930 \u0915\u094d\u0932\u093f\u0915 \u0915\u0930\u0947\u0902 .<\/p>\n<p><a href=\"http:\/\/www.gramalaya.in\/pdf\/appropriateLowcost_toilet_technology.pdf\">http:\/\/www.gramalaya.in\/pdf\/appropriateLowcost_toilet_technology.pdf<\/a><\/p>\n<p align=\"left\">Gramalaya \u2013 Tiruchirapalli<\/p>\n<p align=\"left\">Appropriate technologies on low-cost toilets<\/p>\n<p align=\"left\">Gramalaya \u2013 Tiruchirapalli<\/p>\n<p align=\"left\">Appropriate Low-cost toilet technology \u2013 An Indian perspective<\/p>\n<p align=\"left\">Toilet Technology cum Training center<\/p>\n<p align=\"left\">Gramalaya has been implementing for more than two and half decades various toilet<\/p>\n<p align=\"left\">technology depending on the terrain with the support of WaterAid and Water.org for the last<\/p>\n<p align=\"left\">20 years. There are several designs and technologies available for installing a household type<\/p>\n<p align=\"left\">sanitary latrine. Therefore, it is important to give several technological options or informed<\/p>\n<p align=\"left\">choices to the user to choose and own and maintain a sanitary latrine without much external<\/p>\n<p align=\"left\">support but several inter-related factors play important role in installing a sanitary latrine to a<\/p>\n<p align=\"left\">rural household. This includes:<a href=\"https:\/\/patriotsforumindia.com\/wp-content\/uploads\/2014\/08\/toilet-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-5480\" alt=\"toilet 2\" src=\"https:\/\/patriotsforumindia.com\/wp-content\/uploads\/2014\/08\/toilet-2-300x119.jpg\" width=\"300\" height=\"119\" srcset=\"https:\/\/patriotsforumindia.com\/wp-content\/uploads\/2014\/08\/toilet-2-300x119.jpg 300w, https:\/\/patriotsforumindia.com\/wp-content\/uploads\/2014\/08\/toilet-2.jpg 356w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p align=\"left\">\u2022 Affordability<\/p>\n<p align=\"left\">\u2022 Space in the home<\/p>\n<p align=\"left\">\u2022 Geographical conditions &#8211; soil\/water table etc<\/p>\n<p align=\"left\">\u2022 Cultural habits<\/p>\n<p align=\"left\">\u2022 Availability of water\/scarcity of water<\/p>\n<p align=\"left\">\u2022 Availability of skilled or semi skilled manpower<\/p>\n<p align=\"left\">Gramalaya increases the coverage of toilets by awareness creation, motivation and hygiene<\/p>\n<p align=\"left\">education. Gramalaya through its community based organizations provide accessible<\/p>\n<p align=\"left\">sanitation to every household promoting low-cost technological option and also help the<\/p>\n<p align=\"left\">communities to avail financial assistance from lending institutions.<\/p>\n<p align=\"left\">Gramalaya has established a Toilet Technology cum Training Centre at its rural headquarters<\/p>\n<p align=\"left\">in the village of Kolakudipatti in Thottiam block, Tiruchi district. The Center was established<\/p>\n<p align=\"left\">with funding support from Water.org, USA as a part of its WATSAN programme and<\/p>\n<p align=\"left\">displays a range of toilet models, including an eco-san toilet, which are appropriate for use in<\/p>\n<p align=\"left\">the Total Sanitation Campaign (TSC). The Centre provides training for representatives and<\/p>\n<p align=\"left\">field staff of Non Governmental Organisations (NGOs) and Government officials, including<\/p>\n<p align=\"left\">block co-ordinators involved in the TSC programme as well as to masons and members of<\/p>\n<p align=\"left\">women Self -Help Groups (SHGs) formed by Gramalaya. Here visitors learn how they can<\/p>\n<p align=\"left\">construct zero budget toilets using locally available materials.<\/p>\n<p align=\"left\">Field visits to villages where zero budget toilets are in use are also arranged by the<\/p>\n<p align=\"left\">organisation. The Centre has models of both waterless toilets and toilets that only require<\/p>\n<p align=\"left\">minimal water input, making them suitable in coastal, tribal, rocky and water-logged areas.<\/p>\n<p align=\"left\">Models appropriate for operation in urban areas are also displayed. The Centre has domestic<\/p>\n<p align=\"left\">toilet models ranging in price from Rs.150 to Rs.15000 which are also environment friendly.<\/p>\n<p align=\"left\">All models in the centre are based on the fact that they were successfully introduced in rural<\/p>\n<p align=\"left\">areas in various parts of the district. Gramalaya has also introduced child friendly toilets in<\/p>\n<p align=\"left\">municipalities. These toilets are situated adjacent to the regular toilets constructed by the City<\/p>\n<p align=\"left\">Corporation and therefore are maintained under the pay and use concept by Women Self-<\/p>\n<p align=\"left\">Help Groups. All Child Friendly Toilets are fully utilised by neighbourhood children.<\/p>\n<p align=\"left\">The centre also has miniature models of School toilets which are suitable for primary and<\/p>\n<p align=\"left\">middle schools in rural areas. Similarly the Centre has models of toilets that can be built in<\/p>\n<p align=\"left\">Anganwadis under the TSC programme. Furthermore, there are the facilities to provide<\/p>\n<p align=\"left\">training and demonstration &#8211; for nominal fees &#8211; of toilet models for the benefit of NGO<\/p>\n<p align=\"left\">representatives and government officials involved in water supply, health and sanitation. The<\/p>\n<p align=\"left\">models displayed are only indicative and the Center encourages innovative, location-specific<\/p>\n<p align=\"left\">models using local materials.<\/p>\n<p align=\"left\">\u2022<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Latrines gives social status and privacy for women and children<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u2022<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Sanitation brings improvement in environmental conditions.<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u2022<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Accessible sanitation facilities save time and increases working hours.<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u2022<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Usage of latrines reduce incidence of diarrheal diseases and medical expenses.<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u2022<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Sanitation improves income status<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Technology for Toilets<\/p>\n<p align=\"left\">Gramalaya places emphasis on low-cost, location specific, acceptable technologies and<\/p>\n<p align=\"left\">designs which will be constructed by community members of their own accord and<\/p>\n<p align=\"left\">depending on their socio-economic status, with the support from field staff working for the<\/p>\n<p align=\"left\">project. The technologies promoted by Gramalaya are field tested and proven to be<\/p>\n<p align=\"left\">successful. Whatever Gramalaya has learnt from its various projects over the years is taken<\/p>\n<p align=\"left\">onboard when approaching interested communities. In this way Gramalaya is able to<\/p>\n<p align=\"left\">maintain excellence and innovation with every new intervention community and at every<\/p>\n<p align=\"left\">stage of the project from its beginnings to its completion.<\/p>\n<p align=\"left\">All the above activities either can be supported through grant or loan schemes depending<\/p>\n<p align=\"left\">upon the project area and support available. In all places, more emphasis will be given for<\/p>\n<p align=\"left\">toilets with a bathroom and water storage facilities, and that use water saving rural pans.<\/p>\n<p align=\"left\">Some of the successfully field tested models are provided below:<\/p>\n<p align=\"left\">1. Twin pit pour flush UNDP designed leach pit model in the hard soil areas<\/p>\n<p align=\"left\">2. Single pit pour flush leach pit model with honeycomb brickwork or lined pits using local<\/p>\n<p align=\"left\">stones<\/p>\n<p align=\"left\">3. Dry pit latrines in difficult areas like tribal belts and economically deprived communities<\/p>\n<p align=\"left\">4. Eco-san toilets\/compost latrines for water-logged, water scarce, coastal and rocky areas<\/p>\n<p align=\"left\">5. Community latrines for urban slums\/peri-urban\/densely populated areas where space is a<\/p>\n<p align=\"left\">constraint.<\/p>\n<p align=\"left\">6. Individual toilets with bathroom facilities connected to a sewerage network or<\/p>\n<p align=\"left\">underground drainage areas<\/p>\n<p align=\"left\">7. Child friendly toilets for Anganwadis and school toilet complexes<\/p>\n<p align=\"left\">1. Plinth level toilet with temporary superstructure<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Appropriate where space is limited<\/p>\n<p align=\"left\">2. Easier to empty when pit fills<\/p>\n<p align=\"left\">3. Low cost<\/p>\n<p align=\"left\">4. Superstructure made from locally<\/p>\n<p align=\"left\">available materials such as banana<\/p>\n<p align=\"left\">leaves, bamboo sticks and gunny bags<\/p>\n<p align=\"left\">5. It is appropriate for festival places and during emergencies<\/p>\n<p align=\"left\">6. It is constructed in one day<\/p>\n<p align=\"left\">7. The plinth level basement may be circle or square shape<\/p>\n<p align=\"left\">Cost Estimate :<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Toilet pan with p-trap<\/p>\n<p align=\"left\">(ceramic rural pan<\/p>\n<p align=\"left\">with deep slope) 1 250 250<\/p>\n<p align=\"left\">Jaggery and jute bag for<\/p>\n<p align=\"left\">connecting<\/p>\n<p align=\"left\">the p-trap and pan 75<\/p>\n<p align=\"left\">Squatting slab 1 300 300<\/p>\n<p align=\"left\">Cement 1\/2 bag 140 140<\/p>\n<p align=\"left\">Masonry charges 1 mason 350 350<\/p>\n<p align=\"left\">Sand 3 bond 100 100<\/p>\n<p align=\"left\">Soling stone for pit lining 1\/2 unit 300<\/p>\n<p align=\"left\">Total 1515<\/p>\n<p align=\"left\">2. Toilet only model with superstructure using hollow bricks<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. It is a suitable model for all<\/p>\n<p align=\"left\">2. Low cost<\/p>\n<p align=\"left\">3. Appropriate where space is limited<\/p>\n<p align=\"left\">Cost Estimate :<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount<\/p>\n<p align=\"left\">(in Rs.)<\/p>\n<p align=\"left\">Toilet pan with p-trap<\/p>\n<p align=\"left\">(ceramic rural pan with deep<\/p>\n<p align=\"left\">slope) 1 250 250<\/p>\n<p align=\"left\">PVC pipe &#8211; 4 feet (4 inch dia) 4 feet pipe 22 88<\/p>\n<p align=\"left\">Hollow bricks 75 15 1125<\/p>\n<p align=\"left\">Cement 2.5 bags 275 687<\/p>\n<p align=\"left\">Masonry charges 3 masons 350 1050<\/p>\n<p align=\"left\">Sand 1 bullock cart 400 400<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Soling stone 1 bullock cart 500 500<\/p>\n<p align=\"left\">Cover slab for pit 1 300 300<\/p>\n<p align=\"left\">Transport charges 500 500<\/p>\n<p align=\"left\">Total 5500<\/p>\n<p align=\"left\">3. Toilet attached bathroom using hollow bricks without roof<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Provides privacy for ablution, especially important for women and adolescent girls<\/p>\n<p align=\"left\">2. Provides water storage, bathing and washing facilities inside the toilet<\/p>\n<p align=\"left\">3. Promotes kitchen garden from bathroom waste water<\/p>\n<p align=\"left\">4. Multifunctional structure<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Toilet pan with p-trap (ceramic<\/p>\n<p align=\"left\">rural<\/p>\n<p align=\"left\">pan with deep slope) 1 250 250<\/p>\n<p align=\"left\">PVC pipe &#8211; 10 feet (4 inch dia) 10 feet 22 220<\/p>\n<p align=\"left\">Country bricks (locally made) 500 4 2000<\/p>\n<p align=\"left\">Cement 2.5 bags 275 687<\/p>\n<p align=\"left\">Masonry charges 4 masons 350 1400<\/p>\n<p align=\"left\">Sand 1 bullock cart 500 500<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Soling stones 1 bullock cart 500 500<\/p>\n<p align=\"left\">Cover slab for pit 2 300 600<\/p>\n<p align=\"left\">Transport charges 500 500<\/p>\n<p align=\"left\">Total 7257<\/p>\n<p align=\"left\">4. Toilet only model with superstructure using bricks with roof (Concrete rings pit)<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Low cost<\/p>\n<p align=\"left\">2. Appropriate where space is limited<\/p>\n<p align=\"left\">3. Provides privacy<\/p>\n<p align=\"left\">4. Roof provides cover during rainy season<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Toilet pan with p-trap (ceramic<\/p>\n<p align=\"left\">rural<\/p>\n<p align=\"left\">pan with deep slope) 1 250 250<\/p>\n<p align=\"left\">PVC pipe &#8211; 4 feet (4 inch dia) 4 feet pipe 22 88<\/p>\n<p align=\"left\">Country bricks (locally made) 500 4 2000<\/p>\n<p align=\"left\">Cement 2.5 bags 275 687<\/p>\n<p align=\"left\">Masonry charges 3 masons 350 1050<\/p>\n<p align=\"left\">Sand 1 bullock cart 400 400<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Concrete rings (3 feet dia) 4 250 1000<\/p>\n<p align=\"left\">Cover slab for pit 1 300 300<\/p>\n<p align=\"left\">Transport charges 500 500<\/p>\n<p align=\"left\">Total 6875<\/p>\n<p align=\"left\">5. Twin pit \u2013 Pour flush latrine<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. When the first pit gets filled up, the flow of excreta has to be diverted to the second<\/p>\n<p align=\"left\">pit<\/p>\n<p align=\"left\">2. Two leach pits are connected to one single pour-flush toilet<\/p>\n<p align=\"left\">3. Twin-pit toilets have a high convenience<\/p>\n<p align=\"left\">4. When emptying one pit, people use the another pit<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Details<\/p>\n<p align=\"left\">No. of units<\/p>\n<p align=\"left\">needed<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount<\/p>\n<p align=\"left\">(in Rs.)<\/p>\n<p align=\"left\">Toilet pan with p-trap<\/p>\n<p align=\"left\">(ceramic rural<\/p>\n<p align=\"left\">pan with deep slope) 1 250 250<\/p>\n<p align=\"left\">PVC pipe &#8211; 10 feet (4<\/p>\n<p align=\"left\">inch dia) 10 feet 22 220<\/p>\n<p align=\"left\">Country bricks (locally<\/p>\n<p align=\"left\">made) 500 4 2000<\/p>\n<p align=\"left\">Cement 2.5 bags 275 687<\/p>\n<p align=\"left\">Masonry charges 4 masons 350 1400<\/p>\n<p align=\"left\">Sand 1 bullock cart 500 500<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Soling stones 1 bullock cart 500 500<\/p>\n<p align=\"left\">Cover slab for pit 2 300 600<\/p>\n<p align=\"left\">Transport charges 500 500<\/p>\n<p align=\"left\">Total 7257<\/p>\n<p align=\"left\">6. ECO-SAN toilets<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Avoids contamination of water sources and soil<\/p>\n<p align=\"left\">2. Composting of human waste for use as a natural<\/p>\n<p align=\"left\">fertilizer<\/p>\n<p align=\"left\">3. There is no need of emptying the pits<\/p>\n<p align=\"left\">4. It is applicable for water logged, water scarce,<\/p>\n<p align=\"left\">coastal and rocky areas<\/p>\n<p align=\"left\">5. Promotes soil fertility and improved crop<\/p>\n<p align=\"left\">production<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Hollow bricks 200 15 3000<\/p>\n<p align=\"left\">PVC pipe &#8211; 10 feet (3 inch<\/p>\n<p align=\"left\">dia) 10 feet 36 360<\/p>\n<p align=\"left\">PVC pipe &#8211; 1 inch 10 feet 200<\/p>\n<p align=\"left\">Cement 2.5 bags 275 687<\/p>\n<p align=\"left\">Masonry charges 4 masons 350 1400<\/p>\n<p align=\"left\">Sand 1 bullock cart 500 500<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Roof slab &#8211; 5&#8217;x2.5 &#8216; &#8211; 2 slab 600 1200<\/p>\n<p align=\"left\">Cover slab for chamber &#8211;<\/p>\n<p align=\"left\">2&#215;2 2 300 600<\/p>\n<p align=\"left\">Squatting slab 2 400 800<\/p>\n<p align=\"left\">Pot, buckets with lid 200<\/p>\n<p align=\"left\">Foundation work 700<\/p>\n<p align=\"left\">Transport charges 500 500<\/p>\n<p align=\"left\">Total 10747<\/p>\n<p align=\"left\">6. Bio-gas linked toilets<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Bio-gas is a promising non-conventional energy that converts waste matter<\/p>\n<p align=\"left\">2. Eco-friendly<\/p>\n<p align=\"left\">3. Cost effective<\/p>\n<p align=\"left\">4. Provides a fuel for electricity, heat and light.<\/p>\n<p align=\"left\">5. Bio-manure increases productivity and soil conservation<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Details No. of units<\/p>\n<p align=\"left\">Unit cost (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Total amount (in<\/p>\n<p align=\"left\">Rs.)<\/p>\n<p align=\"left\">Bricks 1500 5 7500<\/p>\n<p align=\"left\">PVC pipe\/ rubber pipe &#8211; 1\/2<\/p>\n<p align=\"left\">inch 1 length 100 100<\/p>\n<p align=\"left\">GI pipe &#8211; 3\/4 inch 1.5 feet 40 60<\/p>\n<p align=\"left\">PVC pipe &#8211; 4 inch 10 feet 22 220<\/p>\n<p align=\"left\">Cement 15 275 687<\/p>\n<p align=\"left\">Masonry charges 6000<\/p>\n<p align=\"left\">Sand 1 bullock cart 500 500<\/p>\n<p align=\"left\">Door 1 600 600<\/p>\n<p align=\"left\">Roof slab -4 x 2 2 slab 300 600<\/p>\n<p align=\"left\">Gas stove 1200<\/p>\n<p align=\"left\">PVC pipe L bend &#8211; 4 inch 1 60 60<\/p>\n<p align=\"left\">Gate volve &#8211; 1\/2 inch 1 80 80<\/p>\n<p align=\"left\">PVC reducer &#8211; 3\/4 x \u00bd 1 10 10<\/p>\n<p align=\"left\">Cover slab &#8211; 3&#215;3 2 400 800<\/p>\n<p align=\"left\">Hollow bricks 100 15 1500<\/p>\n<p align=\"left\">Toilet pan 1 250 250<\/p>\n<p align=\"left\">Foundation work<\/p>\n<p align=\"left\">1000<\/p>\n<p align=\"left\">Total 21167<\/p>\n<p align=\"left\">7. Child friendly toilets &#8211; Model \u2013 I<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Privacy for children<\/p>\n<p align=\"left\">2. Beautiful caricatures of pets and animals on the wall<\/p>\n<p align=\"left\">3. Partition for boys and girls<\/p>\n<p align=\"left\">4. No fear among the children to use the toilet<\/p>\n<p align=\"left\">5. Anal cleaning and hand washing facilities are inside the toilet<\/p>\n<p align=\"left\">6. As the CFTs are constructed adjacent to the community toilets, maintenance is easier<\/p>\n<p align=\"left\">7. Promoting proper hygiene behaviour from childhood<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Sl.<\/p>\n<p align=\"left\">No.<\/p>\n<p align=\"left\">Particulars Quantity\/Nos. Unit cost Amount<\/p>\n<p align=\"left\">Rs.Ps.<\/p>\n<p align=\"left\">1 Cement 15 bags 280.00 4200.00<\/p>\n<p align=\"left\">2 Sand 1\/2 unit 1500.00 1500.00<\/p>\n<p align=\"left\">3. Ground level Earth<\/p>\n<p align=\"left\">work<\/p>\n<p align=\"left\">L.S. \u2026. 1500.00<\/p>\n<p align=\"left\">4. R.R. work foundation L.S. \u2026.. 5000.00<\/p>\n<p align=\"left\">5. Stoneware pipes \u2013 4 \u201c 2 Nos. 60.00 120.00<\/p>\n<p align=\"left\">6. Half-cut PVC pipes,<\/p>\n<p align=\"left\">grating and gully<\/p>\n<p align=\"left\">traps etc.,<\/p>\n<p align=\"left\">L.S.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">2000.00<\/p>\n<p align=\"left\">7.<\/p>\n<p align=\"left\">Pre-cast cement slab \u2013<\/p>\n<p align=\"left\">2\u2019 x 2\u2019 with 6\u201d drop<\/p>\n<p align=\"left\">hole, 2\u201d thickness \u2013<\/p>\n<p align=\"left\">reinforced slab<\/p>\n<p align=\"left\">10 No.<\/p>\n<p align=\"left\">120.00<\/p>\n<p align=\"left\">1200.00<\/p>\n<p align=\"left\">8. Plastering charges L.S \u2026..<\/p>\n<p align=\"left\">2500.00<\/p>\n<p align=\"left\">9. Country Bricks for<\/p>\n<p align=\"left\">basement and<\/p>\n<p align=\"left\">sidewall construction<\/p>\n<p align=\"left\">3000 Nos.<\/p>\n<p align=\"left\">4.00<\/p>\n<p align=\"left\">1200.00<\/p>\n<p align=\"left\">10. Masonry charges 10 Days 400.00 4000.00<\/p>\n<p align=\"left\">11. Unskilled labour<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">10 days 150.00 1500.00<\/p>\n<p align=\"left\">12. Transport charges \u2026.. \u2026.. 1000.00<\/p>\n<p align=\"left\">13. Taps for water supply<\/p>\n<p align=\"left\">with plumbing<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">\u2026.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">14.<\/p>\n<p align=\"left\">White washing and<\/p>\n<p align=\"left\">painting charges<\/p>\n<p align=\"left\">2500.00<\/p>\n<p align=\"left\">Total Cost 29720.00<\/p>\n<p align=\"left\">8. Child friendly toilets \u2013 Model &#8211; 2<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Privacy for children<\/p>\n<p align=\"left\">2. Beautiful caricatures of pets and animals on the wall<\/p>\n<p align=\"left\">3. Partition for boys and girls<\/p>\n<p align=\"left\">4. No fear among the children to use the toilet<\/p>\n<p align=\"left\">5. Annal cleaning and hand washing facilities are inside the toilet<\/p>\n<p align=\"left\">6. As the CFTs are constructed adjacent to the community toilets, maintenance is easier<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Sl. No. Particulars Quantity\/Nos. Unit cost Amount<\/p>\n<p align=\"left\">Rs.Ps<\/p>\n<p align=\"left\">1 Cement 8 bags 280.00 2240.00<\/p>\n<p align=\"left\">2 Sand 1\/2 unit 1500.00 1500.00<\/p>\n<p align=\"left\">3. Groundlevel Earth<\/p>\n<p align=\"left\">work<\/p>\n<p align=\"left\">L.S. \u2026. 1500.00<\/p>\n<p align=\"left\">4. R.R. work foundation L.S. \u2026.. 3000.00<\/p>\n<p align=\"left\">5. Stoneware pipes \u2013 4 \u201c 10 Nos. 60.00 600.00<\/p>\n<p align=\"left\">6. Grating and gully<\/p>\n<p align=\"left\">traps etc.,<\/p>\n<p align=\"left\">L.S.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">400.00<\/p>\n<p align=\"left\">7.<\/p>\n<p align=\"left\">Pre-cast cement slab \u2013<\/p>\n<p align=\"left\">2\u2019 x 2\u2019 with 6\u201d drop<\/p>\n<p align=\"left\">hole, 2\u201d thickness \u2013<\/p>\n<p align=\"left\">reinforced slab<\/p>\n<p align=\"left\">6 No.<\/p>\n<p align=\"left\">120.00<\/p>\n<p align=\"left\">720.00<\/p>\n<p align=\"left\">8. Plastering charges L.S \u2026.. 1200.00<\/p>\n<p align=\"left\">9. Country Bricks for<\/p>\n<p align=\"left\">basement and sidewall<\/p>\n<p align=\"left\">construction<\/p>\n<p align=\"left\">500 Nos.<\/p>\n<p align=\"left\">4.00<\/p>\n<p align=\"left\">2000.00<\/p>\n<p align=\"left\">10. Masonry charges 5 Days 400.00 2000.00<\/p>\n<p align=\"left\">11. Unskilled labour<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">5 days 150.00 750.00<\/p>\n<p align=\"left\">12. Transport charges \u2026.. \u2026.. 500.00<\/p>\n<p align=\"left\">13. Taps for water supply<\/p>\n<p align=\"left\">with plumbing<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">\u2026.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">750.00<\/p>\n<p align=\"left\">14.<\/p>\n<p align=\"left\">White washing and<\/p>\n<p align=\"left\">painting charges<\/p>\n<p align=\"left\">1000.00<\/p>\n<p align=\"left\">Total Cost 18160.00<\/p>\n<p align=\"left\">9. Child friendly toilets \u2013 Model &#8211; 3<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. Privacy for children<\/p>\n<p align=\"left\">2. Beautiful caricatures of pets and animals on the wall<\/p>\n<p align=\"left\">3. Partition for boys and girls<\/p>\n<p align=\"left\">4. No fear among the children to use the toilet<\/p>\n<p align=\"left\">5. Annal cleaning and hand washing facilities are inside the toilet<\/p>\n<p align=\"left\">6. As the CFTs are constructed adjacent to the community toilets, maintenance is easier<\/p>\n<p align=\"left\">Cost estimate :<\/p>\n<p align=\"left\">Sl.<\/p>\n<p align=\"left\">No.<\/p>\n<p align=\"left\">Particulars Quantity\/Nos. Unit cost Amount<\/p>\n<p align=\"left\">Rs.Ps<\/p>\n<p align=\"left\">1 Cement 12 bags 280.00 3360.00<\/p>\n<p align=\"left\">2 Sand 1\/2 unit 1500.00 1500.00<\/p>\n<p align=\"left\">3. Groundlevel Earth work L.S. \u2026. 1500.00<\/p>\n<p align=\"left\">4. R.R. work foundation L.S. \u2026.. 2000.00<\/p>\n<p align=\"left\">5. Stoneware pipes \u2013 4 \u201c 2 Nos. 60.00 120.00<\/p>\n<p align=\"left\">6. Half-cut PVC pipes, grating<\/p>\n<p align=\"left\">and gully traps etc.,<\/p>\n<p align=\"left\">L.S.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">7.<\/p>\n<p align=\"left\">Pre-cast cement slab \u2013 2\u2019 x 2\u2019<\/p>\n<p align=\"left\">with 6\u201d drop hole, 2\u201d thickness<\/p>\n<p align=\"left\">\u2013 reinforced slab<\/p>\n<p align=\"left\">10 No.<\/p>\n<p align=\"left\">120.00<\/p>\n<p align=\"left\">1200.00<\/p>\n<p align=\"left\">8. Plastering charges L.S \u2026.. 1700.00<\/p>\n<p align=\"left\">9. Country Bricks for basement<\/p>\n<p align=\"left\">and sidewall construction<\/p>\n<p align=\"left\">2000 Nos.<\/p>\n<p align=\"left\">4.00<\/p>\n<p align=\"left\">8000.00<\/p>\n<p align=\"left\">10. Masonry charges 5 Days 400.00 2000.00<\/p>\n<p align=\"left\">11. Unskilled labour charges 5 days 150.00 750.00<\/p>\n<p align=\"left\">12. Transport charges \u2026.. \u2026.. 1000.00<\/p>\n<p align=\"left\">13. Taps for water supply with<\/p>\n<p align=\"left\">plumbing charges<\/p>\n<p align=\"left\">\u2026.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">14.<\/p>\n<p align=\"left\">White washing and painting<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">2000.00<\/p>\n<p align=\"left\">Total Cost 28130.00<\/p>\n<p align=\"left\">10. School sanitary complex \u2013 Model 1<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. School Sanitation is a tool for promoting better sanitation and water management for<\/p>\n<p align=\"left\">children<\/p>\n<p align=\"left\">2. Improves the school environment<\/p>\n<p align=\"left\">3. Privacy for school children<\/p>\n<p align=\"left\">4. Promoting proper hygiene behaviours from childhood<\/p>\n<p align=\"left\">5. Operation and maintenance by school children<\/p>\n<p align=\"left\">6. Separate facilities for children for urination and defecation<\/p>\n<p align=\"left\">7. School toilets should be constructed within the school campus<\/p>\n<p align=\"left\">8. Incinerator should be installed in girls toilet for menstrual hygiene management<\/p>\n<p align=\"left\">9. One toilet is enough for primary school children<\/p>\n<p align=\"left\">10. Water facilities and hand washing facilities should be inside of the toilet<\/p>\n<p align=\"left\">Sl.<\/p>\n<p align=\"left\">No.<\/p>\n<p align=\"left\">Particulars Quantity\/Nos. Unit cost Amount<\/p>\n<p align=\"left\">Rs.Ps.<\/p>\n<p align=\"left\">1 Cement 25 bag 280.00 7000.00<\/p>\n<p align=\"left\">2 Sand 2 Unit 2400.00 4800.00<\/p>\n<p align=\"left\">3<\/p>\n<p align=\"left\">Ceramic pan Water Closet 18\u201d<\/p>\n<p align=\"left\">size with P trap and footrest<\/p>\n<p align=\"left\">1 No.<\/p>\n<p align=\"left\">270.00<\/p>\n<p align=\"left\">270.00<\/p>\n<p align=\"left\">4. Stoneware pipes \u2013 4 \u201c or PVC<\/p>\n<p align=\"left\">pipes \u2013 4 inches<\/p>\n<p align=\"left\">6 Nos. 60.00 360.00<\/p>\n<p align=\"left\">5. Earth work excavation charges L.S. \u2026.. 2000.00<\/p>\n<p align=\"left\">6. R.R. foundation work with<\/p>\n<p align=\"left\">soling stone<\/p>\n<p align=\"left\">1 Cart load 750.00 750.00<\/p>\n<p align=\"left\">7. Basement work with R.R. L.S. \u2026. 1500.00<\/p>\n<p align=\"left\">8. White washing and painting L.S. \u2026. 3000.00<\/p>\n<p align=\"left\">9. Ceramic tiles and fitting charges Tiles 8\u201d x 8\u201d<\/p>\n<p align=\"left\">size \u2013 8 boxes<\/p>\n<p align=\"left\">500.00 4000.00<\/p>\n<p align=\"left\">10. Water Tap connection to toilets<\/p>\n<p align=\"left\">and urinals<\/p>\n<p align=\"left\">L.S.<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">11.<\/p>\n<p align=\"left\">Pre-cast cement slab \u2013 4\u2019x 2\u2019<\/p>\n<p align=\"left\">size , 2\u201d thickness \u2013 reinforced<\/p>\n<p align=\"left\">slab for toilet roof<\/p>\n<p align=\"left\">4 No.<\/p>\n<p align=\"left\">300.00<\/p>\n<p align=\"left\">1200.00<\/p>\n<p align=\"left\">12. Door with iron frame and tin<\/p>\n<p align=\"left\">sheet 5\u2019 x 2\u2019 size<\/p>\n<p align=\"left\">3 No.<\/p>\n<p align=\"left\">1000.00<\/p>\n<p align=\"left\">3000.00<\/p>\n<p align=\"left\">13.<\/p>\n<p align=\"left\">Country Bricks \u2013 9\u201d size<\/p>\n<p align=\"left\">3000 Nos.<\/p>\n<p align=\"left\">4.00<\/p>\n<p align=\"left\">12000.00<\/p>\n<p align=\"left\">14.<\/p>\n<p align=\"left\">Masonry charges<\/p>\n<p align=\"left\">10 Days<\/p>\n<p align=\"left\">400.00<\/p>\n<p align=\"left\">4000.00<\/p>\n<p align=\"left\">15.<\/p>\n<p align=\"left\">Unskilled labour charges<\/p>\n<p align=\"left\">20 days<\/p>\n<p align=\"left\">Rs.150.00<\/p>\n<p align=\"left\">3000.00<\/p>\n<p align=\"left\">16.<\/p>\n<p align=\"left\">Transport charges<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">Total Cost<\/p>\n<p align=\"left\">49880.00<\/p>\n<p align=\"left\">11. School sanitary complex \u2013 Model 2<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. School Sanitation is a tool for promoting better sanitation and water Management for<\/p>\n<p align=\"left\">children<\/p>\n<p align=\"left\">2. To improve the school environment<\/p>\n<p align=\"left\">3. Privacy for school children<\/p>\n<p align=\"left\">4. Following hygiene behaviours from the childhood<\/p>\n<p align=\"left\">5. Operation and maintenance by school children<\/p>\n<p align=\"left\">6. Separate facilities for children for urination and defecation<\/p>\n<p align=\"left\">7. School toilets should construct within the school campus<\/p>\n<p align=\"left\">8. Incinerator should be installed in girls toilet for menstrual hygiene management<\/p>\n<p align=\"left\">9. One toilet is enough for primary school children<\/p>\n<p align=\"left\">10. Water facilities and hand washing facilities should be inside of the toilet<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Sl.<\/p>\n<p align=\"left\">No.<\/p>\n<p align=\"left\">Particulars Quantity\/Nos. Unit cost Amount<\/p>\n<p align=\"left\">Rs.Ps<\/p>\n<p align=\"left\">1 Cement 30 bag 280.00 8400.00<\/p>\n<p align=\"left\">2 Sand 2 Unit 2400.00 4800.00<\/p>\n<p align=\"left\">3 Ceramic pan Water Closet 18\u201d<\/p>\n<p align=\"left\">size with P trap and footrest<\/p>\n<p align=\"left\">2 No.<\/p>\n<p align=\"left\">270.00<\/p>\n<p align=\"left\">540.00<\/p>\n<p align=\"left\">4. Stoneware pipes \u2013 4 \u201c or PVC<\/p>\n<p align=\"left\">pipes<\/p>\n<p align=\"left\">8 Nos. 60.00 480.00<\/p>\n<p align=\"left\">5. Earth work excavation charges L.S. \u2026. 1500.00<\/p>\n<p align=\"left\">6. R.R. foundation work with<\/p>\n<p align=\"left\">soling stone<\/p>\n<p align=\"left\">1 Cart load 750.00 750.00<\/p>\n<p align=\"left\">7. Basement work with R.R. L.S. \u2026.. 1500.00<\/p>\n<p align=\"left\">8. White washing and painting L.S. \u2026. 3000.00<\/p>\n<p align=\"left\">9. Ceramic tiles and fitting charges Tiles 8\u201d x 8\u201d<\/p>\n<p align=\"left\">size 12 boxes<\/p>\n<p align=\"left\">500.00<\/p>\n<p align=\"left\">6000.00<\/p>\n<p align=\"left\">10. Water Tap connection to toilets<\/p>\n<p align=\"left\">and urinals<\/p>\n<p align=\"left\">L.S.<\/p>\n<p align=\"left\">\u2026.<\/p>\n<p align=\"left\">1500.00<\/p>\n<p align=\"left\">11.<\/p>\n<p align=\"left\">Pre-cast cement slab \u2013 4\u2019x 2\u2019<\/p>\n<p align=\"left\">size , 2\u201d thickness \u2013 reinforced<\/p>\n<p align=\"left\">slab for toilet roof<\/p>\n<p align=\"left\">8 No.<\/p>\n<p align=\"left\">300.00<\/p>\n<p align=\"left\">2400.00<\/p>\n<p align=\"left\">12. Door with iron frame and tin<\/p>\n<p align=\"left\">sheet 5\u2019 x 2\u2019 size<\/p>\n<p align=\"left\">4 No.<\/p>\n<p align=\"left\">1000.00<\/p>\n<p align=\"left\">4000.00<\/p>\n<p align=\"left\">13.<\/p>\n<p align=\"left\">Country Bricks \u2013 9\u201d size<\/p>\n<p align=\"left\">3000 Nos.<\/p>\n<p align=\"left\">4.00<\/p>\n<p align=\"left\">12000.00<\/p>\n<p align=\"left\">14.<\/p>\n<p align=\"left\">Masonry charges<\/p>\n<p align=\"left\">12 Days<\/p>\n<p align=\"left\">400.00<\/p>\n<p align=\"left\">4800.00<\/p>\n<p align=\"left\">15.<\/p>\n<p align=\"left\">Unskilled labour charges<\/p>\n<p align=\"left\">24 days<\/p>\n<p align=\"left\">Rs.150.00<\/p>\n<p align=\"left\">3600.00<\/p>\n<p align=\"left\">16.<\/p>\n<p align=\"left\">Transport Charges<\/p>\n<p align=\"left\">\u2026. \u2026.. 1500.00<\/p>\n<p align=\"left\">Total Cost 56770.00<\/p>\n<p align=\"left\">12. Anganwadi toilet<\/p>\n<p align=\"left\">Salient features<\/p>\n<p align=\"left\">1. It is a platform for behaviour change for the children<\/p>\n<p align=\"left\">2.<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Promoting hygiene behaviours from childhood<\/span><\/p>\n<p align=\"left\">3. Child friendly door with a provision for opening from inside and outside of the toilet<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">4. Displays pet animal pictures inside the wall, providing a friendly environment<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">5. Smallest toilet pan with 14 inches should be used<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">6. To maintain one foot height of water storing tub. Water tub should be easy to access<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">for children for cleaning and washing<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Cost estimate:<\/p>\n<p align=\"left\">Sl. No. Particulars Quantity\/Nos. Unit cost Total<\/p>\n<p align=\"left\">Rs. Ps<\/p>\n<p align=\"left\">1 Cement 4 bag 280.00 1120.00<\/p>\n<p align=\"left\">2 Sand \u00bd unit 1200.00 1200.00<\/p>\n<p align=\"left\">3<\/p>\n<p align=\"left\">Ceramic pan Water Closet baby<\/p>\n<p align=\"left\">friendly size with P trap and<\/p>\n<p align=\"left\">footrest<\/p>\n<p align=\"left\">1 No.<\/p>\n<p align=\"left\">270.00<\/p>\n<p align=\"left\">270.00<\/p>\n<p align=\"left\">4. Stoneware pipes \u2013 4 \u201c 2 Nos. 60.00 120.00<\/p>\n<p align=\"left\">5.<\/p>\n<p align=\"left\">Pre-cast cement slab for roof \u2013<\/p>\n<p align=\"left\">6\u2019 dia, 2\u201d thickness \u2013 reinforced<\/p>\n<p align=\"left\">slab in 2 pieces for roofing<\/p>\n<p align=\"left\">2 No.<\/p>\n<p align=\"left\">350.00<\/p>\n<p align=\"left\">700.00<\/p>\n<p align=\"left\">6. Door with iron frame and tin<\/p>\n<p align=\"left\">sheet 5\u2019 x 2\u2019 size<\/p>\n<p align=\"left\">1 No.<\/p>\n<p align=\"left\">750.00<\/p>\n<p align=\"left\">750.00<\/p>\n<p align=\"left\">7. Country Bricks 700 Nos. 4.00 2800.00<\/p>\n<p align=\"left\">8. Earth work including pitting<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">500.00<\/p>\n<p align=\"left\">9. Rough stone or soling stone<\/p>\n<p align=\"left\">350.00<\/p>\n<p align=\"left\">10. Cover slab for leach pit 1 no. 300.00 300.00<\/p>\n<p align=\"left\">8.<\/p>\n<p align=\"left\">Masonry charges<\/p>\n<p align=\"left\">6 Days<\/p>\n<p align=\"left\">400.00<\/p>\n<p align=\"left\">2400.00<\/p>\n<p align=\"left\">9.<\/p>\n<p align=\"left\">Unskilled labour charges<\/p>\n<p align=\"left\">6 days<\/p>\n<p align=\"left\">Rs.150.00<\/p>\n<p align=\"left\">900.00<\/p>\n<p align=\"left\">10. White washing and painting<\/p>\n<p align=\"left\">charges<\/p>\n<p align=\"left\">750.00<\/p>\n<p align=\"left\">10.<\/p>\n<p align=\"left\">Transport charges<\/p>\n<p align=\"left\">\u2026..<\/p>\n<p align=\"left\">\u2026.<\/p>\n<p align=\"left\">500.00<\/p>\n<p align=\"left\">Total Cost<\/p>\n<p align=\"left\">12660.00<\/p>\n<p align=\"left\">Leach pit models<\/p>\n<p align=\"left\">Leach pit with honeycomb brick<\/p>\n<p align=\"left\">work model using bricks<\/p>\n<p align=\"left\">Leach pit with honeycomb brick work<\/p>\n<p align=\"left\">model using rough stone or soling<\/p>\n<p align=\"left\">stone<\/p>\n<p align=\"left\">Concrete ring model<\/p>\n<p align=\"left\">Concrete ring model \u2013 top<\/p>\n<p align=\"left\">layer only<\/p>\n<p align=\"left\">2 inches gap<\/p>\n<p align=\"left\">Cover slab<\/p>\n<p align=\"left\">Rough<\/p>\n<p align=\"left\">stone or<\/p>\n<p align=\"left\">soling stone<\/p>\n<p align=\"left\">5 ft<\/p>\n<p align=\"left\">1 mtr<\/p>\n<p align=\"left\">dia<\/p>\n<p align=\"left\">Note: The cost of construction materials and labour involved are subject to change according to<\/p>\n<p align=\"left\">the local conditions and price escalation.<\/p>\n<p align=\"left\">Technical drawings designed by:<\/p>\n<p align=\"left\">Mr. Luke Whaley, Water and Sanitation practitioner, London, UK<\/p>\n<p align=\"left\">Vision<\/p>\n<p align=\"left\">Gramalaya envisions a society in which all people will have equal rights and access to<\/p>\n<p align=\"left\">protected water, sanitation, health and improved income status without gender<\/p>\n<p align=\"left\">discrimination.<\/p>\n<p align=\"left\">Mission<\/p>\n<p align=\"left\">Gramalaya is an NGO dedicated to promoting water, sanitation, hygiene and overall<\/p>\n<p align=\"left\">improvement of the rural, urban, coastal and tribal population in India. Thus, working for<\/p>\n<p align=\"left\">the empowerment of marginalized communities, especially the women and children<\/p>\n<p align=\"left\">For more details, please contact :<\/p>\n<p align=\"left\">Gramalaya<\/p>\n<p align=\"left\">No.C-62 B, 10<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: xx-small;\"><span style=\"font-family: Times-Roman; font-size: xx-small;\">th <\/span><\/span><\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; font-size: medium;\">Cross,<\/span><\/p>\n<p align=\"left\">Further west extension,<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Thillainagar<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Tiruchirapalli \u2013 620 018<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Tel: (0431) 4021563, 2740263<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">Website:<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\"><span style=\"font-family: Times-Roman; color: #0000ff; font-size: medium;\">www.gramalaya.in<\/span><\/p>\n<p align=\"left\">\u00a0<\/p>\n<p align=\"left\">\u00a0<\/p>\n<p>Email:<\/p>\n<p><span style=\"font-family: Times-Roman; color: #0000ff; font-size: medium;\"><span style=\"font-family: Times-Roman; color: #0000ff; font-size: medium;\"><span style=\"font-family: Times-Roman; color: #0000ff; font-size: medium;\">gramalaya@hotmail.com <\/span><\/span><\/span><\/p>\n<p><span style=\"font-family: Times-Roman; font-size: medium;\">\/ gramalaya@airtelmail.in<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u092e\u094b\u0926\u0940 \u091c\u0940 \u0928\u0947 \u0932\u093e\u0932 \u0915\u093f\u0932\u0947 \u0938\u0947 \u091c\u094b \u0938\u092b\u093e\u0908 \u0905\u092d\u093f\u092f\u093e\u0928 \u091b\u0947\u095c\u093e \u0939\u0948 \u0909\u0938\u0915\u094b \u0906\u0917\u0947 \u0932\u0947 \u091c\u093e\u0928\u0947&#8230; <a class=\"meta-more\" href=\"https:\/\/patriotsforumindia.com\/?p=5478\">more <span class=\"meta-nav\">&raquo;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":5479,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[19,3],"tags":[],"class_list":["post-5478","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-articles-2","category-economy"],"_links":{"self":[{"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/posts\/5478","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5478"}],"version-history":[{"count":1,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/posts\/5478\/revisions"}],"predecessor-version":[{"id":5481,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/posts\/5478\/revisions\/5481"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=\/wp\/v2\/media\/5479"}],"wp:attachment":[{"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/patriotsforumindia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}